Stage 5: Notify Building Control
Choose an assigned certifier for your Irish self-build: eligible professions, inspection plans, fees, records and what to agree before work starts.
Appoint your assigned certifier before construction starts if you are using statutory certification. Agree when they will inspect, what records they will keep and what the fee includes.
They coordinate inspections and certify compliance with the Building Regulations. Once foundations, drainage or insulation have been covered, you cannot reliably recreate the inspections you missed.
Under S.I. 365/2015, an owner of a new single dwelling on a single-unit development, or a domestic extension, can submit a Declaration of Intention to Opt Out of Statutory Certification with the commencement notice. That removes the specified statutory certification documents, including the assigned-certifier undertaking and statutory completion certificate. It does not remove the duty to comply with the Building Regulations or the remaining applicable commencement documents.
Decide the route with your professional before submitting the notice. Ask your lender, insurer and solicitor what evidence they require; an opt-out does not establish their acceptance. If you choose statutory certification, agree the inspection and certification work before filing. See commencement notices and certification for the wider process.
Where statutory certification applies, include the Notice of Assignment of Person to Inspect and Certify Works, their undertaking and a preliminary inspection plan with your commencement notice. These requirements were introduced in 2014 and have since been amended, including the opt-out above.
You, as building owner, appoint the person who will inspect and certify the works. Their name is recorded against your project on the building control authority’s public register. A future buyer can inspect it to see who certified the house.
Your certifier’s work has three stages:
Submit a preliminary inspection plan at commencement. At completion, the certificate must have the inspection plan as implemented alongside it, recording the inspections actually carried out.
The plan follows the Code of Practice for Inspecting and Certifying Buildings and Works, or a suitable equivalent. Ask your certifier to confirm which one they follow. If it isn’t the Code, ask them to show you why it is equivalent.
A useful plan is specific. It lists the stages at which the certifier will inspect and what they will look at, in the order the work happens. Typical stages on a new house include:
| Stage | Why it matters |
|---|---|
| Site clearance and setting out | Levels, distances from boundaries and the planning drawings |
| Foundations before pouring | Bearing ground, reinforcement, depth, services under slab |
| Below-ground drainage before backfill | Falls, pipe bedding, connections, testing |
| Floor insulation and damp-proof membrane before slab | Continuity of insulation and membranes |
| Wall construction and cavity details | Cavity trays, wall ties, lintels, thermal bridging details |
| Roof structure and fixings | Timber sizes, strapping, bracing, trussed rafter detailing |
| Insulation and airtightness before closing up | Cannot be seen afterwards |
| First-fix services | Fire stopping, penetrations, ventilation routes |
| Fire safety and means of escape | Doors, windows, smoke detection |
| Completion | Final checks, tests and documents |
The exact stages are for your certifier to set. Treat the table as a list of questions to ask, not as a specification. Ask how the plan covers the risks and construction method of your particular house; visit count alone does not establish adequacy.
Tip
Anything that gets covered up can only be inspected before it is covered. Ask your certifier to agree with the builder how much notice each hold point (a stage where the builder must stop and wait for the certifier’s inspection before covering the work) needs, and write it into the building contract. See choosing a builder and contracts.
The eligible professions are registered architects, chartered engineers and registered building surveyors. Registration alone is not enough: the person must also be competent to inspect and certify your particular works.
Check the relevant register through the Royal Institute of the Architects of Ireland (RIAI), Engineers Ireland or the Society of Chartered Surveyors Ireland (SCSI). When you shortlist, check:
For choosing between an architect and an engineer for the design, see architect or engineer for a self-build. Some owners appoint their designer as certifier; others choose someone separate. Either can work, but be clear on who is responsible for what, because the commencement notice names the designer and the certifier as distinct roles.
Put these in a written appointment, not a handshake:
If you change your assigned certifier or builder after submitting the commencement notice, notify the building control authority within 14 days. Submit the appropriate notices of assignment and forms of undertaking. Article 9(3), as substituted by the Building Control (Amendment) Regulations 2014, sets this requirement. The same duty applies to the 7 day notice route under Article 20A(2).
Do not let this lapse. The completion certificate must be validated against the register. If the register still shows the first certifier and the second one signed the completion certificate, or the first certifier signed for works they stopped inspecting, the authority may query it. Your new certifier will also need the first one’s records, so ask for them to be handed over when the first leaves.
Skipping the required notices or certificates is a criminal offence under the Building Control Act 1990 and its regulations. The old fine figures in the Act have been revised, so ask your solicitor for the current amounts. Where statutory certification applies, the completion certificate must be validated and entered on the register before occupation or use. Rejection or missing documents can therefore delay occupation. Drawdown and sale requirements depend on the lender and conveyancing checks; discuss those separately.
Ask for a reference from a self-builder whose house they certified in the last two years. Find out how quickly they responded to inspection requests and how they handled any work covered up before inspection.
Once the appointment is in place, the next steps are the commencement notice and, at the other end, the certificate of compliance on completion. For insurance questions that arise when you project manage, see insurance when you project manage.
The person you appoint, as building owner, to inspect and certify the works for compliance with the Building Regulations. They give an undertaking before work begins and a certificate on completion.
Being the owner does not qualify you. The role requires a registered architect, registered building surveyor or chartered engineer who is competent for the particular work. Check eligibility and any proposed combination of roles before appointment.
It can be the same firm or a different person. Independence of the design role from the inspection role is a matter to agree with your professional, and the commencement notice names each separately.
You must notify the building control authority within 14 days with the new notice of assignment and a new undertaking.
No. They certify against the regulations on the basis of their inspections. Defects cover is a separate product. See the structural defects guide.
Last reviewed 19 October 2026. Rules and figures change, so confirm anything important with the source before you rely on it.
This guide is general information about self-building in Ireland, not financial, legal or insurance advice. Get advice that fits your own situation before you make decisions.