Heat pump for a new build in Ireland: type, sizing and cost
Choose between air-to-water, exhaust-air and ground-source heat pumps for a new house. Sizing, emitters, cost, grants and how it fits Part L.
Plan insulation, heating and renewables to meet the nearly zero energy building (nZEB) standard. Part L targets, design checks and renovation rules.
Ask your designer to check your insulation, heating, ventilation and renewables together before you seek quotes. New houses must meet the nearly zero energy building (nZEB) standard, so each choice affects the whole-house energy calculation and your budget.
Use the Part L regulations, the applicable Technical Guidance Document (TGD) and the Sustainable Energy Authority of Ireland (SEAI) assessment method together. Ask your designer to record the editions, transitional provisions and targets that apply to your house.
If you are considering a higher voluntary standard, compare Passive House certification with nZEB. For booking the final assessment and collecting the certificate, use the new-home BER guide.
Part L of the Building Regulations deals with conserving fuel and energy. For new dwellings, the European Union (Energy Performance of Buildings) Regulations 2019 (S.I. 183/2019) set nearly zero energy requirements from 1 November 2019, subject to transitional arrangements. They also cover major renovations. Their exemptions include protected and proposed protected structures and specified national monuments; do not treat that as a blanket exemption from every building requirement.
Regulation 8 sets six requirements, listed below. Ask your designer to show how the design meets each. The house must limit energy use and carbon emissions, use renewables, retain heat and have efficient systems you can operate:
| Check | Design requirement |
|---|---|
| Energy and carbon | Limit calculated primary energy use and related carbon dioxide (CO₂) emissions to nZEB levels, insofar as reasonably practicable |
| Renewables | Cover the nearly zero or very low energy requirement to a very significant extent with renewables produced on site or nearby |
| Building fabric | Limit heat loss through insulation, windows, thermal bridging and airtightness; use heat gains where appropriate, including solar orientation |
| Heating | Provide and commission efficient space and water heating, with efficient heat sources and effective controls |
| Oil and gas boilers | Meet a minimum seasonal efficiency of 90% |
| Handover | Give you enough information about the building, fixed services, controls and maintenance to operate it without wasting energy |
The energy and carbon limits are calculated using the Dwelling Energy Assessment Procedure (DEAP) published by SEAI. Regulation 8 refers to nZEB as defined in the European energy-performance Directive; the numerical targets come from the technical guidance. Meeting an individual product specification does not establish that the whole house passes.
Regulation 9 allows the Minister to publish technical guidance. Following it is evidence of compliance; other suitable materials, methods or specifications can also comply. Your designer should identify and document the compliance route.
The Part L guidance for dwellings uses three measures from the DEAP calculation. Check your design against these nZEB thresholds for new dwellings:
These are targets for the whole house, not for individual products, so your designer chooses a combination of fabric, heating and renewables that passes. That freedom is also why two nZEB houses can cost quite different amounts.
Note
The 2022 Part L guidance for dwellings also addresses matters such as controls and electric vehicle infrastructure. The three energy targets do not replace those requirements. Ask your designer to state in writing which guidance edition applies to your project and the energy, carbon and renewable targets it sets.
Regulation 6 applies the 2019 regulations to works in connection with a new dwelling that commence on or after 1 November 2019, with a transitional exception. A dwelling stayed outside if both of these held:
That transitional window closed years ago, so for a house you start now the standard applies in full. The more relevant question is whether a later revision of the TGD has a transitional rule that affects a project with planning permission already granted. Ask your designer to check and record those dates before finalising the specification.
The regulations apply to a major renovation: renovation of a building where more than 25% of the surface of the building envelope undergoes renovation. The “envelope” is every surface through which the building can lose heat to the outside or the ground: walls, windows, floors and roof. When a dwelling undergoes a major renovation, its minimum energy performance, or that of the renovated part, must be upgraded to the cost-optimal level, so far as technically, functionally and economically feasible.
Cost-optimal means the level that gives the lowest cost over the estimated economic lifecycle, counting investment, maintenance, operating and energy costs and, where relevant, disposal. In plain terms it is a cost-benefit test, not a fixed U-value. Smaller works may still have Part L obligations. An extension can also contribute to triggering the major-renovation threshold; have the designer check the affected envelope area. If your project includes an existing building, ask the designer to distinguish its renovation requirements from the new-dwelling specification before seeking quotes.
Agree these design and evidence tasks before placing orders:
Agree inspection hold points with your designer and, where appointed, your assigned certifier. See assigned certifier explained.
To choose the heating and renewables that get you there, read the heat pump guide and the solar PV guide.
nZEB means nearly zero energy building. The regulations define it as a building with very high energy performance, where the very low amount of energy needed is covered to a very significant extent by renewable sources, produced on site or nearby.
For new dwellings, the European Union (Energy Performance of Buildings) Regulations 2019 came into operation on 1 November 2019. Projects that applied for planning permission by 31 October 2019 and had substantial work done by 31 October 2020 were transitional.
The regulations do not name a technology. They require that the energy needed is covered to a very significant extent by renewable sources. Your designer checks the chosen combination using the Dwelling Energy Assessment Procedure (DEAP).
Only partly. A major renovation, where more than 25% of the building envelope surface is renovated, must meet the cost-optimal level so far as technically, functionally and economically feasible. Smaller works fall under the ordinary Part L requirement.
The 2019 regulations do not ban them. They set a minimum seasonal efficiency of 90% for oil and gas boilers. Whether a fossil-fuel boiler can meet the nearly zero energy building renewable and carbon limits in practice must be checked using the Dwelling Energy Assessment Procedure.
Last reviewed 19 October 2026. Rules and figures change, so confirm anything important with the source before you rely on it.
This guide is general information about self-building in Ireland, not financial, legal or insurance advice. Get advice that fits your own situation before you make decisions.