What is exempted development and does a new house qualify?
Exempted development is building work or a change of use that the planning law says does not need planning permission, provided it stays within set limits and conditions.
Quick answer
- New house?
- No. Building a new dwelling is development that needs permission.
- Where the rules sit
- Section 4 of the 2000 Act and the exempted-development schedules in the Planning and Development Regulations.
- Unsure?
- Ask the council for a section 5 declaration; it is the official answer.
- Limits
- Exemptions carry size and condition limits and can be lost by earlier extensions.
How it works in Ireland
Section 32 of the 2000 Act says permission is required for development that is not exempted. A new dwelling is development and is not exempted, so owning the land does not remove the need to apply. Exempted development is for smaller work: certain extensions, garden structures, changes inside a building. The detail is in the schedules to the Planning and Development Regulations, which are amended regularly, so read the current consolidated version, not a summary.
Exemptions have conditions. They usually set a maximum floor area or height, a distance from boundaries, a limit on how much of the garden is covered, and rules for materials. Earlier extensions count towards the limits. An exemption can also be lost where a condition on the original permission removed it, where the site is in a protected area, or where the work needs an environmental assessment.
If you are not sure, ask the council for a declaration under section 5. It is a written decision on whether a described development is or is not exempted. Give an accurate description with drawings and measurements of what exists and what you propose; a vague description gets a vague answer. The declaration can be referred to the planning board if you disagree. A pre-planning consultation is not a declaration, and a planner’s remark at a meeting does not carry its weight.
For a self-builder this matters at three points. Early on, a garage, shed or temporary dwelling on the site is not automatically exempt and can create enforcement problems. During the build, changes from the permitted drawings are not covered by exemption simply because they look small. Later, an extension to the finished house may qualify, but only if the permission’s conditions leave the exemption in place.
If something was built without permission and was not exempt, the route is retention permission, which has its own rules and no guarantee. Checking first can show you never needed it.
Your solicitor will ask about this when you buy a house or site: unauthorised extensions affect title and lending. Keep the permission papers and any section 5 declaration with the house records.
A common mistake
Assuming that because the neighbour built a similar extension it is exempt. Their site may have different conditions, or they may have applied. Check your own grant, add up the earlier work, and ask the council in writing if there is any doubt.
The full guide
This page defines the term. The guide below covers what to do about it.
When do you need retention permission?
Check whether work built without permission needs retention, what it costs and when the council must refuse to consider an application.
Sources
Last reviewed 23 October 2026. Rules and figures change, so confirm anything important with the source before you rely on it.
- Planning and Development Act 2000, section 5 (exempted-development declarations)Law Reform Commission
- Planning and Development Act 2000, section 32, obligation to obtain permissionLaw Reform Commission
- Planning and Development Regulations (current consolidation)Department of Housing, Local Government and Heritage
All planning and the site terms and the rest of the glossary