What is BCAR (Building Control Amendment Regulations)?
BCAR, the Building Control (Amendment) Regulations 2014, is the set of Irish rules that require a new house to have named certifiers, an inspection plan and a registered certificate of compliance on completion.
Quick answer
- In force since
- 1 March 2014, as S.I. 9/2014.
- What it asks of you
- A commencement notice with design and builder documents, an assigned certifier, and a completion certificate on the register before occupation.
- Where you file
- Online, through the Building Control Management System (BCMS), with the council’s building control section.
- Opt-out
- S.I. 365/2015 lets an owner of a new single dwelling opt out of statutory certification.
How it works in Ireland
BCAR, from the first letters of Building Control Amendment Regulations, changed the 1997 Building Control Regulations so that compliance is certified rather than checked by council inspectors on every site. Instead of the council inspecting a house, named professionals take responsibility and the council keeps a public register.
For a self-builder the sequence is: appoint a design certifier, an assigned certifier and a builder; file a commencement notice through the BCMS with their documents and the fee; build with inspections; then lodge the certificate of compliance on completion before the house is occupied.
The regulations are a process, not a technical standard. What the house must achieve is in the Building Regulations 1997 and the Technical Guidance Documents. BCAR decides who certifies it and what is filed.
S.I. 365/2015 added an option for the owner of a new single dwelling in a single-unit development, or a domestic extension, to file a Declaration of Intention to Opt Out of Statutory Certification. A valid opt-out removes the certifiers and the completion certificate procedure, but not compliance with the Building Regulations, planning permission or lender conditions. Many lenders still ask for professional reports.
The council’s role changed with it. Building control authorities no longer inspect every house. They validate what is filed, keep the register, and carry out risk-based inspections and can investigate complaints, so the paperwork you lodge is the main record that your house was built properly. A future purchaser, their solicitor and their lender will read that record, which is why the filings matter after you move in.
A common mistake
Treating BCAR as only a form to file when work starts. It governs the whole build, including who inspects it and what must be lodged before you move in. A house occupied before its certificate is on the register breaches the regulations, and a purchaser’s solicitor will ask for the evidence later.
The full guide
This page defines the term. The guide below covers what to do about it.
Commencement notice: what to file before you start
What to include with a commencement notice for a new house in Ireland, who signs it, when to file it and how to report changes.
Sources
Last reviewed 23 October 2026. Rules and figures change, so confirm anything important with the source before you rely on it.
- S.I. 9/2014, Building Control (Amendment) Regulations 2014Irish Statute Book
- S.I. 365/2015, statutory-certification opt-outIrish Statute Book
- Building Control Regulations 1997 (S.I. 496/1997)Irish Statute Book