Building a house in County Tipperary: economic and social need, Primary Amenity Areas and the €31 per square metre charge

Tipperary's rural housing policy 5-11, the 20 hectare farm test, the 10-year residency rule, seven-year occupancy and the €31 per m² council charge.

Last reviewed 5 sources

661 single houses were completed in Tipperary in 2023 to 2025, ranking 11 of 26 counties (CSO table NDQ06).

Key points

  • Tipperary has three kinds of countryside. In areas under urban influence and in Primary Amenity Areas such as the Glen of Aherlow and the Galtee Mountains you must show economic or social need. In the open countryside you need only meet the normal planning criteria.
  • Economic need means active farming for over 5 years, on a holding of over 20 hectares or on a smaller one that is a significant part of your livelihood and backed by a five-year business plan. Social need means living in the area for 10 years, within 5 km of the site in a Primary Amenity Area or 10 km in an area under urban influence.
  • Every rural applicant must be building a first home, must not own a rural house, and receives an occupancy condition that requires them to live in the house for the first 7 years.
  • The council charges €31 per square metre of floor area for a house in the open countryside, so a 200 square metre house is charged €6,200, with the area of a serviced house you replace exempt.

Who decides, and how to apply

Tipperary County Council decides applications for the county. Its planning enquiry system, ePlan, lets you find any application by reference number, name or address, which is the quickest way to see how the council has treated sites near yours. The rural housing rules are in section 5.5 of the Tipperary County Development Plan 2022-2028, which was made on 11 July 2022 and came into effect on 22 August 2022. A proposed Variation No. 1 published in March 2026 would amend the written statement to match the new national housing growth guidelines. Check which version is in force before you buy a site.

Read how a one-off house application works first. Volume 3 of the plan contains the Tipperary Rural Housing Design Guidelines and the development management standards, and Table 5.2 says both apply to every rural application.

Three kinds of countryside

Tipperary’s Core Strategy divides the rural area into three, and each has a different test. Figure 5.3 of the plan maps them.

  • Areas under urban influence. The council facilitates single houses based on a demonstrable economic or social need to live in a rural area, as well as siting, environmental and design criteria.
  • Primary Amenity Areas. These are visually sensitive uplands and important tourism areas, such as the Glen of Aherlow, the Galtee Mountains and the Lough Derg lakelands. The same need test applies, with a tighter distance rule for social need.
  • Open countryside. The council facilitates single houses on siting, environmental and design criteria. You do not have to show need, but policy 5-11 still requires that you have never owned a rural house, that you apply in the name of the person the house is for, and that an alternative site is not available within a settlement within 5 kilometres. An occupancy condition is attached.

A separate layer, the Strategic Transport Corridors, covers national routes and strategic regional roads. These are generally unsuitable for new housing because of the traffic they carry.

Economic need

Under policy 5-11 you show economic need through active farming, horticulture, forestry or bloodstock activity. There are two routes.

  • Category 1A, a farm over 20 hectares. You must be actively engaged in farming, must have farmed at that location for a continuous period of over 5 years before applying, and must not own, or have owned, a house in the open countryside.
  • Category 1B, a holding under 20 hectares. You must run the activity on a daily basis and show that it is a significant part of your livelihood, or that it provides local employment. You must be trained in good farming practice or qualify for an exemption, have farmed at the location for over 5 years, and must not own a rural house. The council also requires a detailed five-year business plan.

Social need

Social need under Table 5.3 and policy 5-11 depends on where you lived. You must have lived in a rural area for a substantial period of your life, which the plan fixes at 10 years:

  • within 5 kilometres of the site, if it is in a Primary Amenity Area, or
  • within 10 kilometres of the site, if it is in an area under urban influence.

You must also not own, or have owned, a house in the open countryside. A person with exceptional medical circumstances can qualify without the residency, with documents from a registered medical practitioner and a disability organisation proving that they need to live in a particular environment, in a house designed and built for their needs.

The plan states that it follows the European Court of Justice’s ruling on the Flemish Decree. The council says employment-related ties to the area are acceptable criteria because they do not discriminate between locals and non-locals, which is why the economic route rests on work rather than family. For general advice on evidence, see rural housing and local need.

Occupancy condition

Table 5.2 sets four conditions for every new rural house. You must be building your first home for your own permanent occupation, you must demonstrate a housing need, and you must not already own a house in a rural area. The application must be in your name, and an occupancy condition is attached to the permission requiring you to live in the house for the first 7 years after it is built.

Ribbon development, strategic roads and replacements

Policy 5-12 resists further development where five houses exist or are permitted within any continuous 250 metre section of road. An extra house is allowed only if you meet economic or social need, existing or shared accesses are used where practicable and no alternative exists outside the ribbon. A single gap site is allowed where it is within a line of existing houses and fills the gap.

Policy 5-13 allows houses on strategic routes only where there is no alternative site away from the route and one of these applies: you have an economic need, you are the son or daughter of a qualifying farmer and meet social need, or you meet social need and the site has been owned by immediate family for at least 10 years. In the second and third cases the house must share the family house entrance, and sightlines must meet the standards in Volume 3.

Policy 5-15 facilitates replacing a dwelling that is no longer suitable for habitation. Policy 5-16 supports converting rural buildings such as school houses, coach houses and farm buildings. Policy 5-10 allows an extension or sub-division of a house for a dependent relative, within the development management standards.

The development charge

The Tipperary County Council Development Contribution Scheme 2020 was adopted on 9 December 2019 and has applied since 1 January 2020. It stays in force until the council replaces it. Class 1, a house in the open countryside, is charged €31 per square metre, the same as a house in a town or village. A 200 square metre house is therefore charged €6,200. An extension is charged €20 per square metre. Retention permissions get none of the reductions.

If the house you replace was serviced and last used as a dwelling, its floor area is exempt, and you pay the rate only on the extra area of the new house. A planning application for several houses or for another use cannot use this.

The national waiver covered only homes started on site between 25 April 2023 and 31 December 2024. A house starting now cannot qualify. See the waiver guide.

To see how Tipperary’s charge compares, the development contributions table compares the charge for a 200 square metre house across all 31 councils.

Wastewater and site suitability

Table 5.2 says every rural application must meet the plan’s water quality and source protection standards, and the council applies the EPA Code of Practice for wastewater treatment systems for single houses. A site that fails the assessment cannot be built on whatever your local connection. Read site suitability assessments and wastewater treatment systems before you pay for the test.

Apply or search applications: Tipperary County Council

The national guides behind this page

The rules here apply on top of national law. These guides explain each step in full.

Common questions

Do I have to show need to build in the Tipperary countryside?

It depends on the area. In areas under urban influence and in Primary Amenity Areas you must show economic or social need. In the open countryside you need not, but you must meet the normal planning and environmental criteria, you must never have owned a rural house, and no alternative site can be available within a settlement within 5 km.

How long must I have lived in the area to qualify on social need?

You must have lived for a substantial period of your life, which the plan sets at 10 years, in a rural area within 5 km of the site if it is in a Primary Amenity Area, or within 10 km if it is in an area under urban influence. A person who needs a purpose-built house because of exceptional medical circumstances can also qualify, with evidence from a registered medical practitioner and a disability organisation.

How long does the occupancy condition last in Tipperary?

The plan says you must live in the house for the first 7 years after it is built. The planning application must also be made in the name of the person the house is for, to stop speculative building.

Do I pay a development contribution on a house I am replacing?

The floor area of the old house is exempt if the structure is serviced and was last used as a dwelling. Only the additional floor area of the replacement is charged, at the normal rate. The exemption does not apply to applications for several houses or for non-residential uses.

Sources

Last reviewed 22 October 2026. Rules and figures change, so confirm anything important with the source before you rely on it.

  1. Tipperary County Development Plan 2022-2028, Volume 1 written statement, section 5.5, Tables 5.2 and 5.3 and policies 5-11 to 5-16Tipperary County Council
  2. Tipperary County Council Development Contribution Scheme 2020 (adopted 9 December 2019), schedule of contributions and exemptionsTipperary County Council
  3. Tipperary County Council: apply for planning permissionTipperary County Council
  4. Tipperary County Council planning enquiry system (ePlan)Tipperary County Council
  5. CSO New Dwelling Completions (NDQ06), single houses by local authorityCentral Statistics Office

This page is general information about building in Tipperary, not legal or planning advice. Your own site, the exact wording of your permission and the council’s current documents decide your case. Ask the council or a planning consultant before you rely on it.