Rural housing and local need: do you qualify?
How rural housing policy and the local need test work for a one-off house in Ireland: the evidence councils ask for and occupancy conditions.
Roscommon's rural policy zones, the economic and social need criteria in areas under urban influence, the 7-year occupancy condition and the council charge.
302 single houses were completed in Roscommon in 2023 to 2025, ranking 22 of 26 counties (CSO table NDQ06).
Roscommon County Council decides applications for the county. Its planning pages explain how to apply and let you search applications already made, which is a quick way to see how the council has treated sites near yours. The rural housing rules are in chapter 3 of the Roscommon County Development Plan 2022-2028, Volume I, adopted in March 2022 and in effect from 19 April 2022. The council has a review of its plans under way, so check the current text before you buy a site.
Read how a one-off house application works first. Every new rural house must show it follows the principles in the County Roscommon Rural Design Guidelines (objective PPH 3.13).
The plan identifies two rural policy zones, shown on the Commuter Catchment Areas map (Map 3.1):
Table 3.2 of the plan sets two routes:
Three further rules matter. A demonstrated need does not normally warrant permission where you have already benefited from a permission for a dwelling on another site or own an existing property in the rural area, unless exceptional circumstances are shown. Successful applicants must enter a Section 47 agreement restricting occupancy to themselves and their immediate family, or others who meet the criteria, for 7 years. And the plan wants at least 20% of new rural housing on brownfield sites (PPH 3.19). See rural housing and local need for how to assemble your evidence.
The plan favours clusters of houses where more than one is proposed on a landholding and discourages single houses that cause or worsen ribbon development (PPH 3.15). Houses along designated scenic routes are considered where there is no alternative site, such as elsewhere on family land, and the house settles into the landscape, with a visual impact assessment (PPH 3.16). The demolition of a substandard dwelling and its replacement with one house is allowed subject to site suitability and design (PPH 3.17). A house being replaced must still be clearly recognisable as a dwelling and last used as one.
Urban generated housing in the countryside is directed to the towns and villages (PPH 3.14), and the council promotes serviced sites in villages and in towns under 2,000 people as a platform for self-building (PPH 3.20).
Roscommon’s Development Contribution Scheme 2014, as amended on 24 February 2020, charges €3,600 for a rural dwelling and €4,400 for an urban one. Rural means any area without a local area plan or area plan. The scheme adjusts its rates each 1 January using the CSO wholesale price index, so the amount on your permission can be higher than the base rate. It remains in force until the council adopts a replacement.
A replacement house where the original is inhabited, capable of immediate habitation or inhabited in the previous seven years is exempt, and so is a rebuild after fire damage. Retention permissions do not get the exemptions. The national waiver covered only homes started on site between 25 April 2023 and 31 December 2024, so a house starting now cannot qualify. See the waiver guide.
To see how Roscommon’s charge compares, the development contributions table compares the charge for a 200 square metre house across all 31 councils.
Almost every rural house treats its own wastewater, and a site that fails the test will fail the application whatever your local need. Read site suitability assessments and wastewater treatment systems before you pay for the test.
Apply or search applications: Roscommon County Council
The rules here apply on top of national law. These guides explain each step in full.
How rural housing policy and the local need test work for a one-off house in Ireland: the evidence councils ask for and occupancy conditions.
How planning works for a one-off house in Ireland: what the council looks at, the pre-planning meeting, the 8-week decision period and what to prepare first.
Have a council levy waiver? Arrange completion evidence before 31 December 2026. New starts cannot qualify; budget for the contribution in your permission.
Test whether your site can treat wastewater before you buy. Check soil depth, percolation results and distances to wells under Ireland's 2021 Code.
How a septic tank differs from a packaged treatment system, what the 2021 wastewater code requires for a new house, and who registers and maintains it.
Zone A is the area where at least 15% of the population of an electoral division commutes to Athlone, Ballinasloe, Carrick-on-Shannon, Longford or Roscommon town. It is shown on Map 3.1, Commuter Catchment Areas, in Volume I. The Hodson Bay and Barrymore area and the Lough Key area have their own rural housing criteria in Volume II.
Table 3.2 says a demonstrated need will not normally warrant permission where you have already benefited from a permission for a dwelling on another site, or own an existing property in the rural area, unless you can show exceptional circumstances.
Where economic need rests on part-time farming or natural resource work, the plan expects sufficient evidence, such as a herd number or the hours of activity.
It is the base rural rate in the scheme as amended in 2020. The scheme adjusts its rates each 1 January using the CSO wholesale price index, so the amount on your permission can be higher.
Last reviewed 23 October 2026. Rules and figures change, so confirm anything important with the source before you rely on it.
This page is general information about building in Roscommon, not legal or planning advice. Your own site, the exact wording of your permission and the council’s current documents decide your case. Ask the council or a planning consultant before you rely on it.