Rural housing and local need: do you qualify?
How rural housing policy and the local need test work for a one-off house in Ireland: the evidence councils ask for and occupancy conditions.
Kerry's three rural area types, exceptional-need categories, seven-year occupancy condition and the council charge of €1,500 plus €20 per m² over 125.
791 single houses were completed in Kerry in 2023 to 2025, ranking 7 of 26 counties (CSO table NDQ06).
Kerry County Council decides applications for the county, and its planning applications page is where you search for and track them. The rural housing rules are in chapter 5 of the Kerry County Development Plan 2022-2028. The plan was adopted on 4 July 2022, came into effect on 15 August 2022 and incorporates the Minister’s planning direction of 5 December 2022. Councils can vary a plan, so check the current text before you buy a site.
Read how a one-off house application works first. Objective 5-22 requires the design of rural houses to follow the council’s “Building a House in Rural Kerry” design guidelines of 2009, or any update, so read them before your designer starts.
Kerry’s plan follows the 2005 Sustainable Rural Housing Guidelines. The council scored every electoral division and one-kilometre grid cell on population, housing, employment and commuting, weighting population and commuting most heavily, and sorted the results into three types that are shown on Map 5.1.
The plan lists the settlements in each type, such as Killarney, Tralee and Kenmare in the first and Sneem and Waterville in the second. Look up the electoral division of your site on Map 5.1 before you decide.
In both of the first two types you must satisfy the council that your proposal is an “exceptional rural generated housing need”, based on social or economic links to a particular local rural area, and show you fit one of these categories. Each is for building a first home as your permanent residence.
Where you own a landholding, the plan gives preference to renovating, restoring, altering or extending an existing dwelling on it before building a new one. For general advice on evidence, see rural housing and local need.
Section 5.5.2.1 says every permission for rural housing carries an occupancy condition restricting the house to you or your immediate family as a permanent residence for seven years from first occupation. Objective 5-20 repeats this for all rural residential development. Where the council thinks housing on the edges of its towns is becoming overdeveloped, it may also seek an agreement under section 47 of the Planning and Development Act to regulate development in that area.
Objective 5-18 gives favourable consideration to permanent homes on vacant sites in unfinished developments where services are complete. Objective 5-19 requires that rural housing does not harm the landscape, natural and built heritage, economic assets or the environment.
The Kerry County Council Development Contributions Scheme 2017 was adopted on 25 July 2017 and applies to every grant of permission made after that date. A residential unit is charged €1,500, split between roads and transport and community and amenity, plus €20 per square metre of floor area above 125 square metres. A 200 square metre house is therefore charged €3,000. A house of 125 square metres or less pays only the €1,500. An extension is charged €12 per square metre above 40 square metres. The scheme says no indexation applies.
In Tralee and Killarney, including their environs, a further levy of €12 per square metre of residential floor area applies on top. Listowel has its own levy, but it does not apply to houses. Check the scheme’s maps to see whether your site is inside the Tralee or Killarney environs.
The floor area of a house you replace is exempt from the charge if it was serviced and last used as a dwelling, and the extra area is charged normally. A new house funded by a Housing Adaptation Grant for a disabled person is exempt up to 150 square metres, and anything larger pays the normal rate. Retention applications pay 150% and get no exemptions.
The national waiver covered only homes started on site between 25 April 2023 and 31 December 2024. A house starting now cannot qualify. See the waiver guide.
To see how Kerry’s charge compares, the development contributions table compares the charge for a 200 square metre house across all 31 councils.
Almost every rural house treats its own wastewater, and objective 5-16 names wastewater treatment as a test even in the areas where the council is most welcoming. A site that fails the assessment cannot be built on whatever your local connection. Read site suitability assessments and wastewater treatment systems before you pay for the test.
Apply or search applications: Kerry County Council
The rules here apply on top of national law. These guides explain each step in full.
How rural housing policy and the local need test work for a one-off house in Ireland: the evidence councils ask for and occupancy conditions.
How planning works for a one-off house in Ireland: what the council looks at, the pre-planning meeting, the 8-week decision period and what to prepare first.
Have a council levy waiver? Arrange completion evidence before 31 December 2026. New starts cannot qualify; budget for the contribution in your permission.
Test whether your site can treat wastewater before you buy. Check soil depth, percolation results and distances to wells under Ireland's 2021 Code.
How a septic tank differs from a packaged treatment system, what the 2021 wastewater code requires for a new house, and who registers and maintains it.
Only in the rural areas under significant urban influence and under urban influence, which are shown on Map 5.1 of the plan. There you must show an exceptional rural generated housing need through your social or economic links to a local rural area. In other rural areas the council accommodates demand as it arises, subject to normal planning criteria.
In an area under urban influence, yes. Objective 5-15(d) covers someone who has spent a substantial period of their life, over seven years, living in the local rural area where they propose to build a first home. In an area under significant urban influence that category is not open to you, so you need a farming, marine or health route.
Seven years from the date of first occupation. It restricts the use of the house to you or your immediate family as a permanent residence. The council can also ask for a section 47 agreement where it considers an area at the edge of a town is becoming overdeveloped.
The floor area of the house you replace is exempt if you can show it was serviced and last used as a dwelling. The extra floor area of the new house is charged at the normal rate.
Last reviewed 22 October 2026. Rules and figures change, so confirm anything important with the source before you rely on it.
This page is general information about building in Kerry, not legal or planning advice. Your own site, the exact wording of your permission and the council’s current documents decide your case. Ask the council or a planning consultant before you rely on it.