What could your self-build cost?

See what to allow for the house, site and other costs. Change the example to suit your build.

Use the floor area on your drawings.

Example before VAT (the tax on the price); 13.5% is added. Change this below if your quote includes VAT.

Include legal fees and stamp duty. Enter 0 if you already own it.

Example: change the numbers to see yours.

Your estimated project cost

€634,113 to €685,813

For the costs entered, including money for surprises. Check this against your mortgage and savings.

Based on
How the costs add up
CostLowerHigher
House, before VAT200 m² × €1,800€360,000€360,000
VAT added (13.5%)€48,600€48,600
Site purchaseWith legal fees and tax€90,000€90,000
Other costsFees, connections, finishes and more; VAT included€86,048€133,048
For surprises (10%)On everything except the site purchase€49,465€54,165
Total€634,113€685,813

The lower total adds the lower prices; the higher total adds the higher prices. The higher total is not a cap on what you could spend.

Replace remaining examples under “Adjust the details” with your own prices. Check what your builder includes so you count each cost once.

Budget for building damage and injury cover before work starts.

See what cover I need

This is an estimate from the figures you enter; have your architect or building cost specialist check it before you commit.

Every cost and a copy of your budget

How this is worked out
  • House price = floor area × price per m². VAT is added only if your price excludes it. Other costs must include VAT. The contingency (money for surprises) is a percentage of all costs except the site purchase, rounded to the nearest euro.
  • For a price range, fill in both boxes. A line with just one figure uses it for both totals; two blank boxes add nothing. The “By amount” percentages show how much money you marked “Quoted”, “Estimate” or “Unknown”, not the number of items. They use the middle of each price range, before the reserve for surprises.
  • The estimate does not subtract grants, mortgage payments or savings, and entering a zero site purchase does not count the site’s value as cash.
  • Sources: Revenue’s construction VAT rules, Uisce Éireann’s connection charges and planning application fees. Get an electricity connection offer for your site. The starting build price and other allowances are invented examples, not national averages.